Project name: Sulfuric acid production (construction of the second line/expansion of production of SSAP LLP)
Project objective: Sulfuric acid production
Production capacity: 180 thousand tons per year
Project location: Stepnogorsk
Feedstock: sulfur
Number of jobs: 122
Share in the capital: 90,11 %
Current status and future plans: A positive conclusion was received on the feasibility study of the project
Project name: Sulfuric acid production (800 thousand tons)
Project objective: Construction of a sulfuric acid plant for 800 thousand tons per year
Production capacity: 800 thousand tons of sulfuric acid per year
Project location: Taikonur village, Sozak district, Turkestan region
Feedstock: sulfur
Number of jobs: 300
Current status and future plans: commissioning in 2027
Project name: Construction of infrastructure of SEZ «NIРT» 2nd stage
Project objective: Providing infrastructure for the «Butadiene» and «Polyethylene» projects.
The implementation of the project for the construction of infrastructure facilities of the SEZ «NIРT» of the 2nd stage includes the construction of the following facilities:
Project location: Atyrau region, territory of SEZ «NIРT», Karabatan section
Feedstock: hydrocarbon feedstock and purified water
Current status and future plans: a feasibility study for the project is being developed.